The minimum number of projects from the sampling table in the MDD seems small. In an organization of 150 projects do we really only need to sample 3 projects?

In the CMMI V2.0 Appraisal Method, the system does not sampling only "n" projects - it is selecting "n" instances of each PA in the model scope. In reality, the OU sample will be significantly more projects for larger OUs than would have been done for CMMI V1.3 appraisals.